The Tarpaulin Factory at a Glance
We state capacity the way a buyer can audit it: site, area, line count and monthly output. Machines and numbers, not “state-of-the-art facility.”
4 main + 6 finishing lines
Shares the group’s finishing capacity
~120,000 m², 600+ Employees, Since 2002
The two bases together cover approximately 120,000 m² and are supported by more than 600 employees, manufacturing continuously since 2002. The figures are company-reported; what makes them checkable is that they sit on real addresses you can confirm on a map, and on lines you can watch running.
The Tarpaulin Factory at a Glance: Two Bases, Four Lines
We state capacity the way a buyer can audit it: site, area, line count and monthly output.
| Facility | Location | Lines | Monthly Output |
|---|---|---|---|
| LY Linyi base | Linyi, Shandong | 4 main + 6 finishing lines | ~2,000 metric tons (combined) |
| JS Jiangsu base | Jiangsu | Shares the group’s finishing capacity | — |
How We Measure Capacity
Capacity means nothing unless the basis is stated. Ours is line count multiplied by running hours and coating weight — four main lines and six finishing lines producing across a month, not a peak-day number we once touched. That is why we quote monthly output as “about 2,000 metric tons” rather than a larger, less defensible figure. A buyer who asks how we arrived at the number should get an answer they can repeat back to their own manager.
Walk the Tarpaulin Production Lines
The tour is the page. Each line below has dated footage; watch it, then ask us to walk it live.
Weaving, Coating, Finishing
PE tarpaulin starts as HDPE woven fabric, woven in-house on water-jet looms, then coated with LDPE on both sides. On the line you will see the weave take shape, the coating weight applied, and the roll run through cutting, hemming and eyeleting.
- Dated footage
- PE weaving and coating line, Linyi base; filename `pe-tarpaulin-weaving-coating-linyi-2026.mp4`. Alt text: “PE tarpaulin being woven and coated on the production line at the Linyi base.”
- Tensile range
- 120 GSM ≈ 400 N/5cm; 180 GSM ≈ 650 N/5cm. Quoted by grade; batch test report is the reference.
Knife Coating, Welding, Finishing
PVC tarpaulin is a polyester scrim coated with PVC using knife-coating technology, then joined by high-frequency welding. A welded seam is fused rather than stitched, so it does not open into a line of needle holes — the first place a stitched cover fails.
- Dated footage
- PVC knife-coating line and high-frequency welding, Jiangsu base; filename `pvc-tarpaulin-knife-coating-welding-2026.mp4`. Alt text: “PVC tarpaulin being knife-coated and high-frequency welded at the Jiangsu base.”
- Grade range
- From roughly 300 GSM upward for light duty, into heavier grades for truck covers, tents and industrial covers.
Because both PE and PVC sit in one group, we recommend the material the application needs rather than the one we happen to make.
Ask us to walk it liveWarehouses, Laboratory and Container Loading
A factory tour that stops at the coating line is missing the two places a repeat buyer actually needs to see: the lab that proves consistency, and the warehouse that proves stock.
Warehouses and Batch-Labelled Stock
Finished rolls sit batch-labelled in the warehouse, so a given lot can be traced back to its production run. That label is the physical link between the sample you approved and the container you receive.
The QC Laboratory
The lab is where the 26-stage quality control system shows up as instruments rather than a claim. GSM, tensile strength, UV performance and dimensional accuracy are checked in line and in the lab, with test methods following ASTM D751,ISO 13934-1, ASTM D5034 and ASTM D4533. Ask for a sample batch test report and you will see the values a supplier must stand behind.
Export Packing and Container Loading
The last stage is how the product leaves. Rolls are kraft-wrapped, palletised or folded and baled, and container loading is prepared and documented under supervision — see packaging and container loading. For a buyer, this is the difference between a factory that loads its own containers and a trader that relays a booking.
Watch the lab, then ask for the batch test report. The figures are company-reported; what makes them checkable is that they sit on real addresses you can confirm on a map, and on lines you can watch running.
Quality Control SystemHow to Verify a Tarpaulin Factory
This is the question behind most inquiries. A single sign rarely proves anything; what matters is converging evidence. Use this checklist whether you are checking us or any supplier.
Raw material storage
Check 1PE resin, PVC paste or base fabric on site, in volume.
Production floor
Check 2Machines running with product in process, not a showroom.
QC laboratory
Check 3Tensile, GSM and colour-matching equipment, with a sample report to show.
Finished-goods warehouse
Check 4Batch-labelled stock that ties a roll back to its run.
Packaging and loading area
Check 5Export packing and container loading done on site.
A real factory can show all five in one live walkthrough; a trader usually cannot. Be wary of showroom-only tours, pre-recorded loops, or “the line is off today.” We hold no position in this argument that our own footage does not support.
Want to run this checklist on us? Book a live video walkthrough or an in-person visit and we will show you the lines running, not a pre-recorded loop.
Book a live video walkthroughVisit the Tarpaulin Factory — In Person or by Live Video
Tell us your dates and the line you want to see; we will arrange the visit or the live video walkthrough.
Schedule an In-Person Visit
Visitors are welcome at the Linyi and Jiangsu bases. Tell us your intended dates, the size of your delegation and the product line you want to see, and we will arrange the visit, including an invitation letter where your visa process requires one. Read about TONGYUAN first if you want the company history before the facility tour.
Book a Live Video Walkthrough
If travel is not practical, we run a live video walkthrough covering the same five checkpoints above: raw material, production floor, QC lab, finished-goods warehouse and packing. It is a working-hours call with the lines running — not a recorded tour dressed up as live.
Quality Control and Batch Consistency
Our documented 26-stage quality control system checks incoming materials, production and finished goods to help ensure your shipment matches the approved sample.
-
Incoming Material
Check raw materials before production.
-
In-Line Production
Monitor specifications during manufacturing.
-
Pre-Shipment Inspection
Verify finished goods before dispatch.
- GSM
- Tensile Strength
- UV Performance
- Dimensional Accuracy
Batch reports reference named methods such as ASTM D751 and ISO 13934-1. BV or SGS inspection is available on request.
Owned Production. Verifiable Capacity.
See the facilities behind your order.
- Production Bases
- 2
- Factory Area
- ~120,000 m²
- Main Lines
- 4
- Finishing Lines
- 6
- Monthly Output
- ~2,000 metric tons
What Our Customers Say
“We visited the Linyi base before placing our first order. Seeing the four main lines running and the batch-labelled warehouse gave us the confidence to commit. The 26-stage QC is not just a claim — the lab manager walked us through every test.”
“The live video walkthrough was the next best thing to being there. They showed us raw material storage, the PE coating line, the QC lab and container loading — all in one call. We verified the factory without flying to China.”
“As a quality manager, I asked for a sample batch test report before the tour. They provided ASTM D751 and ISO 13934-1 data on the spot. The GSM and tensile values matched the approved sample exactly.”
“We scheduled an in-person visit to the Jiangsu base. The invitation letter for our visas was handled quickly. Walking the finishing lines and seeing the high-frequency welding process convinced us to switch from our previous supplier.”
“The factory tour checklist they published helped us ask the right questions. We confirmed raw material storage, running production, QC lab, batch stock and on-site packing. Everything checked out — we placed a 20GP trial order the same week.”
“We requested BV inspection on our first container. The factory coordinated the visit and provided all the documentation. Batch traceability from roll label back to production run was clear and consistent.”
“Their capacity numbers are auditable. We asked how they calculate ~2,000 metric tons per month, and they walked us through line count, running hours and coating weight. No vague claims — just verifiable figures.”
“The ISO 9001 certificate and SGS reports were provided with full scope and validity dates. We cross-checked them with our compliance team before finalising the contract. The factory tour sealed the deal.”
“We visited both Linyi and Jiangsu bases in one trip. The scale — 120,000 m², 600+ employees — is real. Seeing PE and PVC lines under one group helped us choose the right material for our truck cover range.”
Frequently Asked
Questions About
Factory Tours
Find answers about verifying a factory, visiting in person, live video walkthroughs, certifications and production capacity.
Have Another Question?Share your application and specifications with our export team.
How do I know if a supplier is a factory or a trading company?
Ask for the five checkpoints in one live walkthrough: raw material storage, a running production floor, a QC laboratory, batch-labelled stock and on-site packing. A factory can show all five; a trader usually cannot. Also check the business licence scope for production and manufacturing terms, and confirm the factory address matches the registered address.
Can I visit your tarpaulin factory before ordering?
Yes. We welcome visitors at the Linyi and Jiangsu bases, and we can provide an invitation letter for visa purposes. Tell us your dates and the line you want to see, and we will arrange it.
Do you offer a live video factory tour?
Yes. We run a live video walkthrough over a working-hours call, covering raw material, production, the QC lab, the warehouse and packing. This is the fastest way to verify the factory without travel.
What certifications does your factory hold?
We report ISO 9001 factory certification, and our products are described as meeting SGS and REACH standards. Certificate scope, numbers and validity are available on request — see our certifications — so you can verify them against your market’s requirements.
How many production lines does your factory run?
Four main production lines and six finished-product processing lines across the Linyi and Jiangsu bases, running at a combined capacity of about 2,000 metric tons per month.
What is the factory’s monthly production capacity?
About 2,000 metric tons per month across both bases, measured as line count multiplied by running hours and coating weight. The figure is company-reported, and the basis is stated so a buyer can audit it.
Schedule a Factory Visit
A trader can describe a factory; only a factory can show you one running. Watch the footage on this page, then verify it the way that settles it — live. Tell us the dates, the delegation size and the line you want to see. We will arrange the visit or the live video walkthrough, and quote FOB Qingdao or CIF to your destination port on Incoterms 2020 terms when you are ready.
Visit arrangement · Live video walkthrough · FOB/CIF quote
